LinkFlow connects electronic shelf labels, materials and workstations in three scans — so your shop floor always shows the truth, in real time.
Identify. Locate. Track.
Manual identification is slow, error-prone, and invisible to anyone who isn't standing in front of it.
Worn, unreadable, lost. Manual updates are time-consuming and error-prone.
Impossible to know in real time where each material, part or tool is located.
Wrong part at the wrong station means line stoppage, scrap, non-conformity.
Managers have no real-time overview of the workshop floor status.
Modify any ESL display in real time via WiFi, without moving.
The display is always accurate. No more crumpled paper, lost labels or erased markers.
E-ink ESLs run for months without recharging. Rugged, industrial, IP-rated.
Standard REST API. Compatible with any ERP, WMS or existing management system.
A native mobile app built for the factory floor — large buttons, fast workflow, usable with gloves on.
Point the camera at the barcode on the electronic shelf label.
›Scan the barcode on the part, material or item to associate.
›Scan or enter the workstation or production line code to finish.
LinkFlow sits on top of the eRetail 3.2 ESL platform and speaks REST API to whatever sits beside it.
Every bin, shelf or location displays the part reference, quantity and material status in real time — auto-updated with every movement.
Each station displays the current work order, part to produce and instructions. Operators no longer need to search for information.
At every dock, ESLs display shipment status: in preparation, ready, shipped. Confirmation scan in 3 seconds.
Tool boxes and equipment show their status — available, in use, under maintenance. Instant location.
Designed for European and African markets. Available in French, English and Arabic.
iOS and Android, designed for industrial field use — large touch zones, usable with gloves.
Documented standard REST API. Your IT team can connect any system within days.
No data sent to the cloud without your agreement. Local hosting possible.
First results visible from the first week of deployment. Performance KPIs provided.
GA Huset AB team available in French and English. Training and onboarding included.
Deploy LinkFlow in 30 days. First results visible within the first week.
30 minutes to see LinkFlow in action on your own use case.
Pilot deployment on one line or workshop within 30 days.
Extension to your entire production with dedicated support.